20 EQS Seismic Isolation Bearings were installed on this picturesque Bridge in Ottawa, Ontario. Sizes of bearings ranged from 34 Kips and 170 Kips, all with Uplift Restriction. The Installation was completed in July 2013.
Consultant: Parsons (Delcan)
Bearings: RJ Watson