Located in Kittery, ME & Portsmouth, New Hampshire over the Piscataqua River this 2-Level precast concrete segmental box girder, including a 300 ft. movable lift span, is supported by 4, 194 ft. tall, concrete lift towers. Top level is for vehicular traffic, bottom level is for rail traffic.
Project Team:
General Contractor: Cianbro Corporation
Design Engineer: Hardesty & Hanover/Figg Engineering Joint Venture
Bearings: RJ Watson Inc.